In April 2022, 1&1 Mobilfunk GmbH, a subsidiary of 1&1 AG signed a contract for the construction of 1&1's antenna sites. GfTD will construct 500 antenna sites for 1&1 in the initial stages of the contract<ref name=":4" />.  
In April 2022, 1&1 Mobilfunk GmbH, a subsidiary of 1&1 AG signed a contract for the construction of 1&1's antenna sites. GfTD will construct 500 antenna sites for 1&1 in the initial stages of the contract<ref name=":4" />.  
== Are there any cost-savings from OPEN RAN? ==
Cost savings from building their own network is not to be expected. According to 1&1<ref>https://imagepool.1und1.ag/v2/download/praesentationen/2023-1und1AG-H1-2023-ENG.pdf (page 12)</ref>;
* "The costs of network operation (excluding antenna sites) will be financed by savings on voice traffic and international roaming."
* "Operation costs of an antenna site are largely covered by savings on national roaming, fully from the end of the second expansion stage, completely at 50% household coverage."
* Spectrum costs are to be refinanced through new business areas (FWA, branded reselling, B2B tariffs, etc.).